We Construct Custom Decks

Enjoying Life Outside

Our Services Pricing

Our Services

G.T.A Decks and flooring was established in 2016 constructing decks and installing floors in the greater Toronto area. We focus on 2 sectors in construction decks and flooring. We provide various floor patters on our custom decks which are build according to building code. We also do demolition of old decks/flooring before new construction.

Demolition

Demolition is part of every service in the construction sector. Our service includes removing old worn decks and floors to reconstruct and install. A bin (based on amount of garbage) will be needed to dispose the old material which will not be provided by us. We can arrange for a local disposal bin company to drop off a bin at which the home owner will be liable for that bill. Demolition prices are below for both decks and flooring.

Decks

We build custom decks for individuals and their property. All decks we build meet building codes with or without a permit. We build strong structures where you can invite many friends/family for a gathering on your custom built deck. All decks we build are framed, anchored, fastened, tied and braced to provide the necessary strength and rigidity.

Flooring

A step into any house or condo and the first thing people observe are the floor. It is important to have beautiful floors to match the room in every house. GTA decks & flooring install elegant flooring in a neatly fashion. Our team can install hardwood and laminate floors for residential and commercial. We also install baseboards and corner rounds to applicable jobs.

We get it Done Right

Contact Us For A FREE Quote
We Complete The Job On Time Or The Construction Is 100% FREE

Let's Start

Basic Time Line for Decks

1.) Process Ontario1 call to ensure no pipes are below construction area (5 Business days)
2.) Construct footing (1-2 days). We give the concrete and the soil/clay/sand around the footing to settle for 2 days.
3.) Framing Deck (1- 3 Days)
4.) Planks (1-2 Day)
5.) Railing/stairs (1-3 days)
6.) Additional Customization (1-3 days)

Pricing

Demolition

Demolition of per square foot
Decks $4.00
Hardwood $1.00
Laminate $.50

Decks

Footing/Framing/Floor boards
Materials Included in price
Type of Wood per square foot
Pressure Treated (Spruce) $24.00
Cedar $30.00

Additional cost – Floor pattern, over 2 feet, Stairs, Railing, Skirts, Privacy fence, Bench, Lights

*We also construct composite Decks (Material price vary on color and type)*

Flooring

Material Not included in price
Type of Wood per square foot
HardWood $1.90
Laminate $1.30

Additional cost – Baseboard and quarter round

Gallery

Call for a FREE Quote (647) 400 - 5053

Frequently asked questions

On average we take 2-4 weeks to complete a deck. It takes 2-5 business days for ontario1call to collect data on your house and confirm if any pipes(gas/water) are under the ground where we plan on structuring the footing . If a permit is required the pending process depends on the city and how fast they can approve each phase.

A permit is only required if the deck being built is above 23 5/8 inches from the ground. If it’s above 23 5/8 inches various building codes will need to be passed for the safety of every individual standing on top or beneath the structure.

- If the deck will be above 23 5/8 inches you will need to apply for a permit in your city
- Call Ontario1call to figure out if there is gas or water pipes beneath where the deck will be constructed.
- Ensure that soil/sand/dirt is on a downward slope away from your house wall foundation. This is to prevent any flooding when it rains. Some home owners get their homes waterproofed before constructing a deck.

We Charge a base rate per square foot which is shown on the pricing section of the page. The base rate includes the material and construction of footing, post, beam, joist and planks (floor boards). There will be additional charges per square foot if the deck is built over 5 feet, borders or floor patterns are included. We split a deck job into two phases. Two contracts will be created; 1.) for footing, post, beam, joist and planks; 2.) Railing, stairs, skirts, lights, privacy fence and other customization. The Second contract will be created once the first contract is completed.

Contact Us

Email : info@gtadecksandflooring.ca
Web: www.gtadecksandflooring.ca

Call : (647) 400 - 5053
Monday: 8:00am - 8:00pm
Tuesday:8:00am - 8:00pm
Wednesday: 8:00am - 8:00pm
Thursday: 8:00am - 8:00pm
Friday: 8:00am - 8:00pm
Saturday: 9:00am - 6:00pm
Sunday: Closed